CASE STUDY

Energy From Waste
Plant Upgrade Works

Client: PJD Location: LONDON & BELFAST Sector: INDUSTRIAL Scope: STRUCTURAL DESIGN & ANALYSIS

T12 designed and analysed the required structural steelwork modification scope to support the installation of pulsed gas detonation devices, for the removal of refractory build up within boilers on several EFW plants across the UK.

This upgrade improved upon existing steam-based soot blowers, improving efficiency of the boiler and overall plant.

T12 performed site survey through to design, analysis and modification/manufacturing and installation support.

We strive to ensure our projects deliver for our clients.   

SCOPE OF WORK
  • PERFORM SITE SURVEY SCOPE
  • DETERMINE ENGINEERING AND DESIGN ACTIVITIES REQUIRED
  • CONCEPT DESIGN AND PRELIMINARY ANALYSIS FOR CLIENT REVIEW
  • DETAIL DESIGN, INCLUDING FABRICATION DRAWINGS AND ANALYSIS REPORT
  • DELIVER DOCUMENTATION
  • PROVIDE ONGOING SUPPORT TO AID SUCCESSFUL PROJECT COMPLETION